12”NS Cable pull through pig
Following the mobilisation of the personnel,
temporary pig launcher and equipment on schedule, the operation was coordinated in conjunction with a 3rd party on behalf of the end Client.
On completion of the ground works and with the pipeline exposed and the temporary launcher /
receiver installed complete with pigging pump
fitted, the cable pull through was good to
commence.
After pigging of the metal bodied pig which became lodged due to an unknown crushing of the pipeline, a special dual density foam pig was produced in record time to be on-site to be able to run through the pipeline, but also be able to negotiate a 45% pipeline reduction.
The project was completed successfully and ahead of budget.